
Rear additions
A bigger kitchen, family room or main-floor bedroom off the back of the house.
Rear additions, second storeys and rooms over the garage, with the drawings and the City of Vaughan permit handled for you.
Rough budgets before HST. The real number comes after a site visit and drawings. Additions under about 400 sq ft cost more per square foot, and underpinning is priced separately. See the full cost guide.

Going up keeps your yard and can double the bedrooms on the same lot. Before anything is drawn, an engineer checks that the foundation and walls can carry the new floor.
Second storeys fall in the same rough budget as other additions, $300 to $500 per sq ft before HST.
Read the second-storey guideYes. Every addition in Maple needs a building permit from the City of Vaughan, and some need a heritage review first. Read the full permit guide.
Any addition, a second storey, a room over the garage or a bump-out.
A site plan, floor plans, elevations, sections, structure and a heating design for the new space.
10 business days for a complete house application under the Building Code.
Houses in the Village of Maple Heritage Conservation District get reviewed against the district plan first.
Lots in the Toronto and Region Conservation Authority's regulated areas need its approval.
If the addition doesn't meet the zoning by-law, it goes to the Committee of Adjustment first.
Rear, side and second-storey additions in Maple and across the City of Vaughan.
The village around Keele Street and Major Mackenzie Drive, and the subdivisions around it.
Village in northwest Vaughan.
Southwest Vaughan, along the Humber River.
The Vaughan side of Thornhill, west of Yonge Street.
Yes. Additions need a building permit from the City of Vaughan. Houses in the Village of Maple Heritage Conservation District also get a heritage review.
As a rough budget, $300 to $500 per sq ft before HST. Design and permits are priced separately and quoted after the site visit.
Plan on 2 to 6 months for design and permits, then 5 to 9 months to build, depending on the size, inspections and any changes along the way.
The Ontario Building Code gives the municipality 10 business days to review a complete application for a house. Comments and resubmissions add time.
Often, yes, if the foundation and walls can carry it and the zoning allows the height. An engineer checks the structure before anything is drawn.
Only if the addition doesn't meet the zoning by-law, for example on setbacks, height or lot coverage. That goes to the Committee of Adjustment before the building permit.
The Village of Maple Heritage Conservation District covers the older village core. If your house is in it, the addition gets a heritage review before the building permit.
A site visit shows what your lot allows and what an addition would involve.